Appointed via the Framework this scheme was essential to replace critical end-of-life equipment supporting the extensive network. The result was reduced risk within the infrastructure and improved operational operation.
Project
- Chiller replacement due to End of Life (EOL).
Stage 1
- Feasibility Study
Stage 2
- Strategic Scheme Design
- Business Case development
Stage 3
- Design Development
- Contracts
- Procurement
- Principal Contractor appointment
Stage 4
- Technical Design
Stage 5
- Project & Commercial Management